The objective of this project was to construct paving and drainage improvements at 4 separate locations at West Houston Airport.  An automobile parking lot required a complete reconstruction due to subsurface soil conditions.  The remaining 3 areas were repaired and resurfaced.  The largest area to be improved was an aircraft apron located on the east side of the airport.

Main Terminal Building Phase 1 - Pavement Removal and Stockpiling Phase 1 - Earthwork and Grading
Phase 1 - Parking Lot Reconstruction Phase 1 - Parking Lot Reconstruction Phase 2 - Pavement Repairs and Resurfacing
Phase 2 - Pavement Resurface Operation Phase 2 - Aircraft parking Apron Phase 2 - Aircraft Parking Apron
Phase 3 - Terminal Entrance Road - Pavement Repairs Phase 3 - Terminal Entrance Road - Pavement Resurface

 

                                                                